Page 17 - Craft Bearing Catalog
P. 17

Lubrication  Installation Guide for Craft Split Roller Bearings
                                                                                                         Bearing Company Inc.




                   n Tool List                                           1     Check the Shaft

                   •  Micrometer to suit shaft size
                                                                           efore mounting any components, the shaft
                   •  SAE Allen wrench set                             Bshould be checked at the intended location
                   •   Torque wrench                                   of  the  bearing  for  diameter,  roundness,  taper,
                   •  Anti-seize compound                              and conformity to a straight edge. The tolerance
                   •   Means to lift and safely support shaft          of  the  shaft’s  diameter  is  +0.000”  to  -0.004”,
                     during bearing installation                       where  the  dn  <  2,000,  and  +0.000”  to  -0.002”,
                   •  Rubber mallet                                    where the dn > 2,000. The shaft’s roundness and
                   •  Channel locks                                    taper tolerance is ±0.001” and the surface finish is
                   •  Feeler gauge set                                 to be 125 to 63 μin. Remove any rust, nicks, burrs,
                   •  Strap wrench                                     high spots, and ensure that the shaft is clean and
                   •  /8” diameter straight shank drift pin            dry before mounting any components. Use the
                     1
                   •  Clean, lint free cloth                           reference images below as a reference for how
                   •  Appropriate viscosity lubricant                  to check the shaft.



                INSTRUCTION #1: Check the Shaft



























                  2     Bearing Installation Preparation



                   ndividual  bearing  components  should  not             The shaft should be raised and fully supported
                Ibe  interchanged.  The  components  of  each          before installing the bearing. It is good practice to
                bearing  are  matched  at  the  factory  for  proper   locate shaft position, and install the held (fixed)
                fit  and  internal  clearance.  To  facilitate  proper   bearing first. This practice serves to anchor the
                assembly,  all  Craft  split  bearings  are  provided   shaft in position and facilitate proper positioning
                with match mark numbers at the mating faces of         for the expansion bearing on the shaft.
                the individual components. Be sure to completely
                disassemble  the  bearing  components,  remove
                all protective plastic, and wipe the oil from all
                surfaces at installation.


 Craft Bearing Company, Inc.  n  Newport News, Virginia  n  www.craftbearing.com  Craft Bearing Company, Inc.  n  Newport News, Virginia  n  www.craftbearing.com  15

         Craft	Bearing	2017	Catalog	+	Spe15			15                                                                     8/14/17			1:51:26	PM
   12   13   14   15   16   17   18   19   20   21   22